...

Home / Factory & Capabilities / Low-Volume Injection Molding

SOURCING & PILOT PRODUCTION · 100 PCS TO SCALE

Low-Volume Injection Molding in China: From 100-Piece Pilot Runs to Production

Hardware startups and industrial equipment brands rarely jump straight to 20,000 units on Day 1. Hongqing supports pilot runs starting from 100 pcs and standard production from 2,000 pcs in real production-grade molds, with mutual NDA protection upfront and full contractual mold ownership.

Pilot runs from 100 pcs · Production from 2,000 pcs

Prototypes from 10 days · Tooling from 30 days

You own the mold · NDA signed before file share

ORDER TIERS & TRANSPARENCY

How pilot batches, sub-2,000 pc runs, and mass production work

Instead of turning away growing product lines or hiding setup costs, we price each stage transparently.

01 · PILOT RUNS (FROM 100 PCS)

EVT / DVT, Compliance & Beta Units

Validate real injection-molded resin properties, snap-fit feel, robotic paint, and CE/FCC certification samples before releasing full production orders.

02 · SUB-2,000 PC ORDERS

Industrial & High-Mix Enclosures

Need fewer than 2,000 pcs per batch? Tell us your batch quantity and estimated annual usage; we show clearly how machine setup and changeover affect unit price before quoting.

03 · MASS PRODUCTION (2,000+ PCS)

Direct Scale-Up Without Re-Tooling

Because your mold is built in our Sodick/Makino toolroom (±0.01 mm) and runs on our 80T–1300T presses, scaling from 100 pilot units to thousands requires zero supplier handoff.

TIMELINE & OWNERSHIP

What to expect from first NDA to FOB / EXW shipment

Step 1 · NDA & File Review (1 Business Day)

Sign mutual NDA first; send STP/X_T files or concept brief

Engineers check parting lines, draft, undercuts, and press fit before itemizing quote

Step 2 · Pre-Tooling Prototype (From 10 Days)

3D-printed or CNC prototypes; ODM design from US$1,500 if needed

Verify assembly fit and ergonomics before cutting mold steel

Step 3 · In-House Tooling & T1 (From 30 Days)

Built in Qiaotou toolroom; trialed on 80T–1300T presses

Dimensional FAI checked on 4 vision machines and CMM

Step 4 · Ownership & Global Delivery

Mold & paid design IP belong to you in writing; removable anytime

Shipped FOB or EXW via sea, air, or express courier; on-site & video audits welcome

WHY DIRECT FACTORY BEATS BROKERS ON SMALL RUNS

Direct access to tooling, finishing, and assembly under one roof

Online manufacturing brokers often route your 200-piece pilot batch to a small job shop that cannot paint, print, assemble, or scale with you next quarter. At Hongqing (founded in 2000 in Pinghu, Shenzhen; in Qiaotou, Dongguan since 2006), your pilot run is molded, painted, laser-marked, and assembled in our 20,000 m² ISO 9001 & IATF 16949 certified plant.

Review our published starting rates on the Pricing & MOQ page, check our contractual commitments on How We Work, or send your files directly on our Request a Quote page.

Send 3D Files for Review →
Reparto di stampaggio a iniezione di Hongqing

FREQUENTLY ASKED QUESTIONS

Common engineering & sourcing questions

What is your minimum order quantity for low-volume injection molding?

Pilot runs after tooling start from 100 pcs, and standard mass production starts from 2,000 pcs. If your batch is between 100 and 2,000 pcs, share your order quantity and annual forecast so we can itemize setup cost versus unit part price clearly.

Who owns the injection mold when we start with low-volume runs?

Once tooling is paid in full as agreed in the purchase contract, mold ownership belongs to the buyer. Every mold is stamped with a unique asset nameplate and stored in dedicated racks in our 20,000 m² Qiaotou, Dongguan facility.

Should we use 3D printing, CNC machining, or bridge tooling first?

For 1 to 50 validation units before design freeze, CNC or 3D-printed prototypes (from 10 days) avoid steel modification costs. Once geometry is frozen and you need 100+ parts in production resin for certification or market launch, single-cavity injection tooling is more economical.

Can a single-cavity pilot mold scale up later without starting over?

Yes. A single-cavity mold built in our in-house toolroom (±0.01 mm machining precision) continues producing thousands of parts reliably, and when demand grows to tens of thousands per month we can build a multi-cavity production tool using proven gate and cooling parameters.

Inviateci ciò che avete. Tracceremo il percorso fino alla produzione in serie.

In qualunque fase di sviluppo vi troviate, Hongqing può offrirvi la soluzione produttiva adatta. Dalla valutazione iniziale del progetto, allo stampo e allo stampaggio, fino a finitura, assemblaggio e spedizione, vi aiutiamo a portare il progetto passo dopo passo alla produzione di serie.

Utile allegare: schizzi, disegni o file 3D, volumi annui e mercato di riferimento.

Responsabile della Dongguan Hongqing Plastic Mould Products Co., Ltd.
Torna in alto