Home › Factory & Capabilities › Quality Control
Quality Control · ISO 9001 · IATF 16949
Quality Control for Plastic Parts: 20-Person QC Team, Four Inspection Gates, ISO 9001 and IATF 16949
Hongqing's 20-person QC team inspects molded parts and finished products at four gates: incoming, first article, in-process and outgoing. Key dimensions are measured on 4 2D vision measuring systems and a CMM, and outgoing sampling follows GB/T 2828.1 (ISO 2859-1) AQL or your standard. The factory is certified to ISO 9001, ISO 14001, ISO 45001 and IATF 16949 and has passed BSCI and Sedex audits.
We'll sign an NDA before you send drawings · Or email info@dghongqing.com
Last updated: October 2026
20-person QC team
Four inspection gates
ISO 9001 · IATF 16949
Third-party inspection welcome
Inspection process
Four gates, from incoming material to shipment
Every gate keeps inspection records; when something is off, the QC team records it, reports it and drives the fix.
20 people
on the QC team
4 gates
of inspection
AQL
outgoing sampling per GB/T 2828.1 (ISO 2859-1)
1
Incoming inspection
Before production we check resin, metal parts, electronic components and packaging against spec, appearance, quantity and lot; nonconforming material never enters production.
2
First-article approval
Every batch starts with a first article, checked for dimensions, appearance, color and fit against the signed-off sample before mass production begins.
3
In-process inspection
Scheduled patrols and spot checks during molding, painting, printing and assembly, watching for sink, warpage, flash, color variation, print misalignment and assembly gaps.
4
Outgoing inspection
Before shipment we sample per GB/T 2828.1 (ISO 2859-1) AQL or your standard, checking appearance, dimensions, function, quantity, packaging and labels.
Inspection equipment
In-house testing and measuring equipment
We use this equipment for both development validation and production QC; which tests your product needs can be agreed at the planning stage.
2D vision measuring systems
4 units for key dimensions, hole positions and profiles
Coordinate measuring machine (CMM)
3D dimensions, flatness and assembly relationships
Temperature and humidity chamber
Temperature and humidity reliability testing
Salt spray tester
Corrosion testing of metal parts and coatings
Impact tester
Strength and impact testing of housings and structural parts
Dynamic balancing machine
Balance testing of fans, impellers and other rotating parts
Product certification testing
CE, UL, FCC and similar certification tests are done by accredited third-party labs, not in-house
QC inspection room
2D vision and CMM measuring room
Reliability test lab
Environmental and corrosion testing
These photos were taken at Hongqing's plant in Qiaotou, Dongguan; you will see the same QC rooms and equipment during a factory visit or video audit.
Certificates
Certifications and social audits
Hongqing is certified to ISO 9001, ISO 14001, ISO 45001 and IATF 16949 and has passed BSCI and Sedex audits. Below are scans of our ISO 9001, ISO 14001 and IATF 16949 certificates and BSCI and Sedex audit documents; email us for electronic copies.
ISO 9001
Quality management
ISO 14001
Environmental management
IATF 16949
Automotive quality management
BSCI
Social compliance audit
Sedex
Ethical trade audit
Standards and inspection
Which standard we inspect to, and who inspects
Inspection standards, sampling plans and inspection arrangements are all agreed in writing before you order.
01
Sampling standard
GB/T 2828.1 (ISO 2859-1) AQL
Inspection level and AQL values follow your requirements or are agreed in writing before the order; tighter sampling or 100% inspection is available on request.
02
Third-party inspection
Inspect at our factory
Before shipment, you or an inspection company you appoint can inspect at our factory; if travel isn't practical, book a video audit.
03
Automotive parts
Managed under IATF 16949
IATF 16949 is the quality system widely required in the automotive supply chain, and automotive part projects can be managed under it.
Processes covered by QC
Every step from tooling to assembly is inspected in-house
Tooling, molding, finishing and assembly share one site, so any quality issue can be traced to the responsible step.
Injection Mold Manufacturing
Our tool shop designs and machines molds to ±0.01 mm, up to 1.5 m, and trials them on our own presses.
Explore mold making →
Injection Molding
90+ presses from 80T to 1300T; mold trials and production both run in our own factory.
Explore injection molding →
Surface Finishing & Secondary Operations
6 robotic painting lines, 30+ pad printers and 7+ automatic screen printers, plus UV printing, laser marking and conductive coating.
Explore finishing →
Product Assembly
5 assembly lines in an enclosed workshop with an air shower: heat-staked inserts, insert assembly, complete product assembly, packing and shipping.
Explore assembly →
What does Hongqing check in a first-article inspection?
Hongqing starts every batch with a first article, which QC checks against the drawing and the signed-off sample in 4 areas: key dimensions (measured on 2D vision systems or a CMM), appearance (sink, flash, scratches, color and gloss), fit (trial assembly with mating parts) and functional requirements. Mass production starts only after the first article matches your approved sample and the record is filed; if it fails, we adjust process settings or the mold and make a new first article. This step stops problems before mass production and avoids reworking a whole batch.
What does each part of Hongqing's 20-person QC team do?
Hongqing's 20-person QC team covers 6 areas: incoming inspection, in-process inspection, dimensional measurement, reliability testing, assembly checks and outgoing inspection. Incoming inspectors check resin, metal parts, electronic components and packaging; patrol inspectors spot-check molding, painting, printing and assembly lines; dimensional checks use 4 2D vision measuring systems and a CMM; reliability tests use a temperature/humidity chamber, salt spray tester and impact tester; and outgoing inspection samples per GB/T 2828.1 AQL or your standard. When something is off, the team records it, reports it and drives the fix.
How does Hongqing confirm and measure key dimensions and tolerances?
Hongqing measures key dimensions on 4 2D vision measuring systems and a CMM, and the dimensions and tolerances on your 2D drawing are the standard. In the DFM review we confirm which dimensions are critical and whether the tolerances are achievable in tooling and molding, and suggest changes where they are not. Trial samples and every batch's first article are measured, production parts are spot-checked on a set patrol frequency, and outgoing inspection follows the agreed sampling standard. Without a 2D drawing, our engineers can propose key dimensions from your 3D files and assembly, which become the inspection basis once you approve them.
What do ISO 45001, BSCI and Sedex mean for buyers?
Beyond ISO 9001 (quality), ISO 14001 (environment) and IATF 16949 (automotive quality), Hongqing is certified to ISO 45001 for occupational health and safety and has passed BSCI and Sedex social compliance audits. The first three show that products, environmental impact and processes are managed systematically; the last three show that working conditions, labor practices and safety have been checked by third parties, which many European and US brands require when choosing suppliers. Scans of our ISO 9001, ISO 14001 and IATF 16949 certificates and BSCI and Sedex audit documents are on this page; email us for electronic copies, or audit us against your own supplier checklist.
Send us what you have. We'll map out the route to mass production.
Wherever you are in development, we'll propose the right manufacturing plan, from early design review through tooling and molding to finishing, assembly and shipping, and move your project step by step to mass production.
Helpful to include: sketches, drawings or 3D files, annual volume and target market.